        當前位置::首頁 > 技術支持 > 電壓擊穿試驗儀操作方式 技術文章

        電壓擊穿試驗儀操作方式

        點擊次數:2182  更新時間:2017-06-12

        電壓擊穿試驗儀操作步驟:

        1、試驗前的準備:1)打開試驗機右側的總電源開關,預熱15分鐘。2)打開計算機進入Windows系統。雙擊本儀器軟件的快捷圖標打開試驗登錄界面輸入登錄密碼即可進入試驗界面。

        2、交直流試驗的切換1)本儀器高壓輸出為交流電壓。直流的獲得方式為在原回路中串入高壓硅堆,使測試回路為脈動的直流電壓。實現的過程為,硅堆已經在高壓變壓器的高壓絕緣塔中,平時用一個短路桿把高壓硅堆短接。需要直流試驗時,取出短路桿,使高壓硅堆接入測試電路中,這時回路的電壓為脈動的直流電壓。

        2)前面板直流交流選擇按鈕。該按鈕的狀態不能改變設備輸出的電壓性質。按下該按鈕,設備僅僅是把直流報警電路接入。指示用戶,當打開箱門時,您需要對高壓均壓球放電。轉動放電桿,使放電桿的端部銅球接觸高壓均壓球。建議用戶每次放電銅球接觸高壓均壓球時間大于五秒。

        3)試驗的交直流電壓切換,主要取決于高壓絕緣塔中的短路桿是否取出。當取出短路桿時,高壓均壓球上的電壓為直流電壓,插入短路桿時,高壓均壓球上的電壓為交流電壓。短路桿的取出、插入參看左側的示意圖。

        4)在直流試驗時,計算機也要選擇直流狀態,否則測的結果是不正確的。簡單的說,交流電壓與直流電壓有倍的關系。

         

        電壓擊穿試驗儀是高壓輸出設備,安裝搬動使用應特別注意人身與設備的安全。請注意以下事項:

        1 設備務必接16A單相220V交流電插座。

        2 設備兩個接地端子之一務必通過地線導線接配電箱的地線。

        3使用前,設備兩個接地端子之一務必接放電棒。

        4 試驗中,觀察檢測電流如果長時間維持在20-30mA,應立即停止試驗,以免負載過大燒毀保險管。

        5 一次試驗完畢,務必先斷掉電源,再用放電棒放掉高壓輸出端的剩余電荷。

        6 如遇緊急情況,應立即按壓“急停”按鈕斷電。

        7 長時間不用,斷開所有電源線。

        8 搬運時不能傾斜角過大,以免變壓器油流出。

        9 換試樣前,確保已經用放電棒放過電,且電源處于斷開狀態。

        10 測試過程如遇試樣著火,務必先斷電源,后滅火。

         

         

        Operation procedure of voltage breakdown tester:
        1. Preparation before test: 1) open the main power switch on the right side of the test machine and preheat for 15 minutes. 2) turn on the computer and enter the Windows system. Double click the instrument software shortcut icon, open the test login screen, enter the login password, you can enter the test interface.
        2 、 AC and DC test switch 1) this instrument high voltage output is AC voltage. The way to obtain DC is to connect the high voltage silicon stack into the original circuit, so that the test circuit is a pulsating DC voltage. The implementation process, has been in a high voltage silicon stack transformer insulation tower, usually with a short rod, short circuit high-voltage silicon stack. When the DC test is needed, the short circuit rod is removed so that the high voltage silicon stack is connected to the test circuit, and the voltage of the circuit is a pulsating DC voltage.
        2) front panel DC AC select button. The status of the button cannot change the voltage characteristic of the device output. Press this button, the device is only to connect the DC alarm circuit. Instructs the user when you open the door of the box, you need to discharge the ball evenly under high pressure. Turn off the pole so that the end of the pole is in contact with the high-pressure ball. It is recommended that each user discharge copper balls in contact with high pressure equal pressure ball for more than five seconds.
        3) the AC / DC voltage switching of the test mainly depends on whether the short rod in the high voltage insulated tower is taken out. When the short circuit rod is taken out, the voltage on the ball is a direct current voltage, and when the short circuit rod is inserted, the voltage on the high voltage equalizing ball is an alternating voltage. Take out the short pole and insert it. See the diagram on the left.
        4) in the DC test, the computer should also choose the DC state, otherwise the result of measurement is incorrect. In brief, the AC voltage is twice as much as the DC voltage.
        Voltage breakdown test instrument is a high voltage output device. Installation, movement and use should pay special attention to the safety of people and equipment. Please note the following:
        1 equipment must be connected to 16A single-phase 220V AC socket.
        2 one of the two grounding terminals of the equipment must be connected to the ground wire of the distribution box through a dedicated earth wire.
        3 before use, one of the two grounding terminals must be connected with the discharge rod.
        4 in the test, if the observation current is maintained at 20-30mA for a long time, the test should be stopped immediay so as not to overload the fire tube.
        5 a test finished, be sure to unplug the residual charge and then put off the high voltage output end of the bar.
        6, in case of emergency, should immediay press "emergency stop" button, power failure.
        7 do not use for a long time, disconnect all power lines.
        8, handling can not tilt too large angle, so as not to transformer oil flow.
        In 9 samples, make sure you've let the electric discharge rod, and the power is disconnected.
        10 test process, in case of fire, be sure to break the power supply, and then extinguish the fire.

         

         

        重點詞匯釋義

        • 擊穿試驗breakdown test; flash (ing) test; spark-over test; disruptive test
        • 操作步驟operating steps
        • 快捷圖標short-cut icon
        • 交流電壓alternating voltage
        • 高壓硅堆high voltage silicon rectifier stack; high-voltage silicon stack
        • 測試回路test loop; testing loop
        • 直流電壓volts d.c.; direct voltage
        • 高壓變壓器high tension transformer; high-voltage transformer (HVT); high voltage transformer
        • 高壓絕緣high-voltage insulation; high voltage insulation
        • 測試電路test circuit; test connection
        聯系人:陳丹
        手機:
        18911395947
        點擊這里給我發消息
         
        主站蜘蛛池模板: 亚洲av熟女| 中文无码制服丝袜人妻av| 内射人妻视频国内| 少妇被爽到高潮喷水久久欧美精品| 日韩中文字幕在线一区| 亚洲人成电影网站 久久影视| 久草免费av| 国产精品 视频一区 二区三区| 国产亚洲欧美另类久久久| 国产精品美女AV免费观看| 无码日韩精品一区二区免费暖暖 | 狠狠躁夜夜躁人人爽天天bl| 精品无码成人片一区二区| 中文字幕久热视频在线| 男女xx00上下抽搐动态图| 爆乳女仆高潮在线观看| 日韩亚洲欧美在线| 最新国产精品自在线观看| 神马久久亚洲一区 二区| 国产95在线 | 欧美| 人妻无码中文字幕一区二区三区| 亚洲aⅴ天堂av天堂无码| 国产精品99区一区二区三| 亚洲AV中文| 日韩成人av电影| 欧美福利在线观看| 国产AV福利第一精品| 亚洲精品美女久久777777| 99精品视频在线观看婷婷| A级毛片视频免费观看不卡| 99久久亚洲综合网精品| 亚洲乱码二区| 日本午夜网站| 精品福利一区二区免费视频| AV不卡在线永久免费观看| 国产农村1级毛片| 国产免费无码一区二区| 国产精品爽爽v在线观看无码| 欧美性受xxxx喷水性欧洲| 91麻豆国产视频| 别揉我奶头~嗯~啊~一区二区三区|